Seam Orientation Stands
The T&H Lemont seam orientation stand is designed to position the weld seam in any location between the 10 o’clock and the 2 o’clock position.
The seam orientation stand is positioned after the induction welding section to maintain the weld seam at top dead center to ensure proper annealing of the tube and pipe weld seam. Likewise, when forming shapes from a round tube or pipe, the seam orientation stand can maintain the weld seam at top dead center during the shaping process.
If the customer specification calls for the weld seam to be moved to a different location, the seam orientation stand can easily do this and maintain the weld seam in its new location.
Technical Specifications
Item # | Outer Diameter (OD) Min. | Outer Diameter (OD) Max. | Wall Thickness Min | Wall Thickness Max |
---|---|---|---|---|
280/6 | 0.750 in | 3.500 in | 0.028 in | 0.250 in |
540/7 | 1.000 in | 6.750 in | 0.040 in | 0.280 in |
700/9.5 | 3.500 in | 10.750 in | 0.060 in | 0.375 in |
1020/12.7 | 4.500 in | 12.750 in | 0.100 in | 0.500 in |
1120/12.7 | 5.000 in | 14.000 in | 0.100 in | 0.500 in |