×

Seam Orientation Stands

The T&H Lemont seam orientation stand is designed to position the weld seam in any location between the 10 o’clock and the 2 o’clock position.

The seam orientation stand is positioned after the induction welding section to maintain the weld seam at top dead center to ensure proper annealing of the tube and pipe weld seam. Likewise, when forming shapes from a round tube or pipe, the seam orientation stand can maintain the weld seam at top dead center during the shaping process.

If the customer specification calls for the weld seam to be moved to a different location, the seam orientation stand can easily do this and maintain the weld seam in its new location.

REQUEST A QUOTE »

T&H Lemont, Inc.

5118 Dansher Road, Countryside, IL 60525 USA

Technical Specifications

Item #Outer Diameter (OD) Min.Outer Diameter (OD) Max.Wall Thickness MinWall Thickness Max
280/60.750 in3.500 in0.028 in0.250 in
540/71.000 in6.750 in0.040 in0.280 in
700/9.53.500 in10.750 in0.060 in0.375 in
1020/12.74.500 in12.750 in0.100 in0.500 in
1120/12.75.000 in14.000 in0.100 in0.500 in